Screen Upgrade - Thruxton 1200

Remove the standard screen.

New fasteners are provided but retain the two lower fixings and remove the two lower well-nuts from the Screen.

Refit the two lower fixings whilst locating the well-nuts behind the fairing panel.

Position the screen between the metal support arms and the fairing, taking care to align the screen holes adjacent to the fairing holes.

Loosely fit the 6 fasteners, using the metal washers and lock-nuts on the inside of the screen.

Make sure that the lower edge of the screen fits slightly underneath the lower fairing section and tighten the lock-nuts - take care not to over-tighten, just enough to prevent movement.